|
 |
|
| |
|
|
| |
There is completed infrastructure in the Zone such as telecommunication bureau, postal center, transit station combined by rail, road and river transportation with annual handling capacity of 1,100,000tons, thermal power station supplying 600,000tons of steam annually, gas pipe system, transformer substation, water mill of 100,000tons capacity and sewage treatment plant. Inisde the Zone, Fenghuang Industry and Trade Section is well equipped with electronic power, tele-communication (broad band), water, sewage treatment, road, heating and steaming. |
|
| |
 |
|
|
|
|